Marine Technology Reporter Blogs - osx
OSX looking at building drill rigs for Petrobras
With the work on its new shipyard underway, OSX, the shipbuilding and ship rental company belonging to the EBX Group, is planning on entering tenders in order to try and get a piece of the contracts for 21 drillers for Petrobras. The OSX shipyard is being built within the Açu Port area (the Açu Port is also in construction and is also owned by the same EBX Group). Sete Brasil is administering the construction of the 21 drillers, which will then be leased to Petrobras. Petrobras itself will oversee the tender process. Sete Brasil is one of the local companies participating in the tender and they have already been awarded the contract for construction of the seven first drillers, which are being built at the Atlantico Sul shipyard in the Brazilian northeast state of Pernambuco.
OGX – Intensifying Discovery Appraisals and Planning on ordering 3 more FPSOs
Paulo Mendonça, CEO of OGX stated that the first quarter of 2011 was very important for the Brazilian operator. OGX has been intensifying the campaign to appraise its discoveries in the Campos basin, where 16 wells have been spud since the beginning of the year, of which 10 are appraisal wells for the accumulations Waikiki, Pipeline and Illimani (Campos Basin) and Fazenda São José (Parnaíba Basin), with the intent of converting 3C contingent resources into 2C and 1C, and thereafter into reserves. -Delivering the vital and time sensitive declaration of commerciality to ANP (National O&G regulator), related to the discoveries in Campos, Santos and Parnaíba Basins.
Sete Brasil and the Petrobras National Drillship Program
Sete (Seven) Brasil is the newest Petrobras offspring. The the new private company was launched to administer the 28 drillships that Petrobras will order. The tender process for the first seven orders was won by EAS shipyard, located in the Suape Complex, close to the city of Recife, in the Northeast State of Pernambuco. The total price for these seven drillers adds up to $4.637 billion, which means a $13 million discount from the original proposal. The final price for each driller is pegged at around $662 million and the drillers are scheduled to start operations by 2015. During construction the forecast is for 32 thousand direct and indirect job openings. In its operational phase, the forecast is for 10 thousand direct and indirect jobs for a period of 10 years.
Maritime Infrastructure Projects Targeting Brazil O&G Market
As Petrobras announces that it will go through with five more deepwater pre-salt drilling projects this year, totaling 16 pre-salt wells drilled in 2010, a number which will probably increase in 2011 and more pre-salt, deepwater and shallow water plays keep being uncovered, new shipyard and new port projects are getting underway to make up the some of the infrastructure deficit in Brazil.OSX has finally defined that its shipyard will be build next to the Açu Port and Industrial Complex in the northeast coast of the state of Rio de Janeiro. The final decision was decision was based on the competitive advantages of UCN Açu, as attested by the results of comprehensive engineering…