Forum Expands DYNACON Facility in Texas
Forum Energy Technologies, Inc. announced the completion of the expansion of its DYNACON facilities in Bryan, Texas. The expansion effectively doubles the square footage of manufacturing space to 110,775 sq. ft. which includes larger welding and assembly shops. Additionally, a new 53,000 sq. ft. testing facility has been added as well as a new state-of-the-art environmentally controlled blast and paint booth which will speed associated processes.
The implementation of multiple shifts, coupled with the new larger facilities, has enabled a significant reduction in cycle time for new equipment builds with additional cycle time reductions on the horizon. Forum said the investment in the DYNACON facility will help to reduce build time as well as increase capacity to take on additional projects.
Since 1986 DYNACON has specialized in the design and manufacture of winches and handling systems for a wide variety of offshore applications ranging from ROV Launch and Recovery Systems (LARS), to oceanographic winches, a-frames, electro-hydraulic power units, motion compensated cranes, and other deck equipment that is used around the globe for launch and recovery missions.
f-e-t.com