Benthic Complete Geotechnical Site Survey off Australia

May 26, 2021

Benthic provided Santos with geotechnical site investigation services at the Dorado field off the coast of Western Australia.

The work included geophysical and geotechnical surveys, consisting of multiple Cone Penetration Testing (CPT) and borehole locations up to 100m.

The PROD2 seabed drilling and geotechnical testing system. Photo courtesy Benthic
The PROD2 seabed drilling and geotechnical testing system. Photo courtesy Benthic

The company used its PROD2 seabed drilling and geotechnical testing system, a proprietary portable remotely operated drill that can switch between piston sampling and rotary coring to maximize productivity. 

The tool can recover 75mm diameter cores with continuous sampling capability in water depths to 3,000m. It also operates on the seabed and is isolated from vessel motion via a slack umbilical, which reduces weather sensitivity and downtime, resulting in more efficient operations. PROD2 executed the project onboard the MMA Vigilant.

Related News

Blueye: Making An ROV Autonomous Light Pollution Shown to Negatively Some Static Marine Organisms Teledyne Marine's 2025 Photo and Data Contest Is Now Open IMO Calls for Action After UN Ocean Conference DEEP’s Vanguard Pressure Vessel Aces Submergence Test off Scotland