Two Dual-LiDAR Buoys Deployed

March 10, 2015

AXYS Technologies site engineering team show ORE Catapult's Chairman, Colin Hood, the first of the two dual-LiDAR WindSentinel floating LiDAR systems (Photo courtesy of AXYS Technologies)
AXYS Technologies site engineering team show ORE Catapult's Chairman, Colin Hood, the first of the two dual-LiDAR WindSentinel floating LiDAR systems (Photo courtesy of AXYS Technologies)
AXYS Technologies Inc. (AXYS) has deployed two dual-LiDAR WindSentinel floating LiDAR systems, utilizing the Offshore Renewable Energy (ORE) Catapult’s offshore anemometry mast. According to AXYS, this will be the world’s first deployment of a floating LiDAR system to feature two LiDARs, as each system has an additional Zephir 300, AXYS’ first deployment of this sensor.
 
The WindSentinel systems will be deployed in the North Sea, three nautical miles off the coast of Blyth, Northumberland for a one month validation and research study at the ORE Catapult’s National Renewable Energy Centre.  They will then be moved to France for a 12-month campaign as part of a bankable energy assessment for two commercial wind farms.
 

Related News

Decom Engineering Launches Ultra-Light Chopsaw for Subsea Ops DeepOcean Bolsters Subsea Robotics Fleet with Eight New ROVs JDR Wraps Up Type Test Qualification of Next-Gen Offshore Wind Cables NKT Picks OSBIT to Deliver ‘World’s Most Powerful’ Subsea Trencher Coming in from the Cold: Canadian Arctic Security Takes Center Stage