Pharos Completes Diver-less Export Cable Repair

January 27, 2016

Pharos Offshore successfully completed a diver-less export cable repair for London Array using the Subsea Hydraulic Cable Grab.

Basslink, a subsea cable connecting George Town in Tasmania and Loy Yang in Victoria, has a possible fault with the cable which is approximately 100km off the Tasmanian coastline in Bass Strait. Using the Subsea Hydraulic Cable Grab and a team of personnel from Pharos, the cable will be recovered for repair. Pharos delivered a work package with the rapid mobilisation of Expertise, Equipment to locate, and recover the subsea cable.
Photo courtesy of Pharos Offshore
Photo courtesy of Pharos Offshore
Reacting quickly to customer requirements the system was prepared and shipped within 2 days. Pharos Offshore delivers engineering solutions for subsea cable installation, maintenance and repair.

Related News

Taihan’s Palos CLV Installs Export Cables for South Korean Offshore Wind Farm LR Authorized to Certify Remotely Operated and Unmanned Vessels Whale Fecal Samples Link Ocean Warming to Rising Algal Toxins in Arctic Waters Hanwha Ocean Floating Turbine Receives ABS Approval KIMM Cracks the Code for Underwater Radiated Noise Prediction