ATSB Releases Preliminary Report on Nuyina Grounding

March 16, 2026

An ATSB preliminary investigation report details the circumstances leading up to the brief grounding of the Australian research vessel Nuyina off Heard Island, 4,000 km south-west of Perth, October 13 last year.

The grounding occurred while Nuyina, the Australian Antarctic Division’s research and supply vessel, was conducting drone survey operations over the shore of Heard Island, close to an area of uncharted seafloor.

Source: ATSB
Source: ATSB

On board the vessel were 37 marine crew and 85 expeditioners.

“Nuyina had several scientific instruments installed on a retractable drop keel, which at the time of the incident was extended 75cm below the vessel’s nominal 9 meter draft,” ATSB Chief Commissioner Angus Mitchell said.

“One of the drop keel devices was a high-resolution multi-beam echo sounder system, which was still collecting data, after having been used for overnight bathymetric surveys in deeper water.”

To avoid acoustic interference, the ship’s navigational echo sounders were switched off.

“Depth information from the multi-beam system was shown on a dedicated display on the bridge but was not fed into the ship’s integrated bridge system. This meant the depth information was not displayed on the electronic chart display and information system (ECDIS), and could not be used to generate navigational alarms,” Mitchell said.

Nuyina had been conducting the drone aerial survey work while holding position using its dynamic positioning system off Fur Seal beach before the voyage leader requested the master reposition the ship to a new location around 5 miles to the north-west, the preliminary report details.

After discussion with the second officer the master then planned a route to the new location on the ECDIS planning station in the aft area of the bridge, conducted a route check and loaded it in the system.

The second officer then began turning the ship towards the intended course, which increased the load on the on thrusters as it turned abeam to the wind. On the master’s request the second officer then took the ship on manual control and began the transit.

However, at this point they noted that the new route was not visible on the forward ECDIS.

While the master tried to correct this issue with the ECDIS, the second officer followed an electronic bearing line which had been loaded earlier to guide the ship along the coast while it was conducting the drone flights.

“This bearing line was in a similar direction to the planned route, taking the ship between an unsurveyed area to the west and a charted bank to the east,” Mitchell explained.

A short time later, the acoustics operator contacted the bridge by phone to advise that the multibeam was showing a depth of 15 meters. Shortly after, the master ordered ‘stop engines’ followed a short time later by ‘dead slow astern’.

At about the same time the acoustics operator contacted the bridge again, to warn of shallow water.

However, Nuyina then briefly grounded, with its retractable drop keel initially impacting the seabed, followed by the ship’s hull.

The vessel then cleared the shallow water and drifted away from the coast, before the crew stopped its movement and held position.

The drop keel was retracted for inspection, revealing substantial damage with mounted instruments damaged or missing.
The hull of the ship itself only sustained scratches and paint damage.

After consultation with the relevant authorities and experts ashore, Nuyina continued its operations at Heard Island as well as a scheduled resupply operation at Davis station in Antarctica before returning to Hobart.

Mitchell said the ATSB’s investigation had so far included interviews with key personnel, examination of recorded data and CCTV footage, and the gathering of operational documentation and historic and recorded bathymetric data.

“As the investigation proceeds, the ATSB will examine operator procedures, as well as recorded data from the vessel and the bathymetric data, before determining the safety factors which contributed to this occurrence,” he said.

A final report will be released at the conclusion of the investigation.

Related News

Exail Sells Drix H-9 USV to European Client Fugro to Support Protection of Pacific Communities from Rising Seas Lamprell Secures ONGC Deal for Subsea Pipeline Replacement Project Automatic docking as an enabling technology for the operational autonomy of underwater systems Port of the Future 2026: A Look Back, a Path Forward