Búzios 6: TechnipFMC Nets 'Large' Subsea Deal with Petrobras

January 25, 2022

Oilfield services giant TechnipFMC has said it has secured a contract with Petrobras to build and install subsea equipment at Búzios 6 field (module 7), a greenfield development in the pre-salt area.

TechnipFMC said the contract was a large one. For TechnipFMC, a “large” contract is between $500 million and $1 billion.

Credit: Dennis/AdobeStock
Credit: Dennis/AdobeStock

The contract covers flexible and rigid pipe, umbilicals, pipeline end terminals, rigid jumpers, umbilical termination assemblies and a mooring system.

Jonathan Landes, President, Subsea at TechnipFMC, commented: "We are excited to announce this award, which demonstrates the continuing strength of the subsea market in Brazil and our collaborative relationship with Petrobras. We used our deep understanding of the client’s needs to arrive at technological solutions developed specifically for the Búzios 6 field.”

The flexible pipe, umbilical, and subsea structures, as well as some of the rigid pipe, will be manufactured in Brazil.

Related News

SeaBird Exploration Nets Contract Extension for Seismic Survey Vessel Viridien Teams Up with NVIDIA to Accelerate Seismic Imaging Workflows TGS Embarks on Multi-Client 2D Survey off Angola Orbital Marine Grows UK and Canada Tidal Energy Orderbook to 32MW Transocean-Valaris Tie-Up to Create $17B Offshore Drilling Major with 73 Rigs