SEA-KIT Awarded ZEVI Funding to Build Hydrogen-fueled USV
and dispensing.Engineering design and sustainability specialists, Marine Zero, will support Marine2o with regulatory compliance and the design and integration of the dispensing facility. The Port of London Authority (PLA), a consortium partner, will host the hydrogen refilling station on the River Thames in London and subsequently operate the ZEPHR USV.John Dillon-Leetch, PLA’s port hydrographer, said, "Our support of this exciting project underlines our commitment to creating a Net Zero future on the tidal Thames. Embracing innovation and new fuel technologies utilized on ZEPHR will enable
Port of London Launches Fully-electric Survey Vessel
vessels would be impractical or unsafe, such as shallow waters, or close inshore or around and under marine structures. Its battery- powered electric thrusters provide a much more environmentally-friendly solution than traditional marine diesel or petrol engines.(Photo: Port of London Authority)The tidal Thames is home to the UK’s port and busiest inland waterway; accurate and regularly updated riverbed data is essential to safe navigation. The PLA’s port hydrographer, John Dillon-Leetch, said, “We’re delighted to lead the way in launching this remote surveying vessel with UCL.&ldquo
OSIL Vibrocorer Plays Role in £600M River Thames Flood Defense Scheme
The OSIL Vibrocorer has been in use on the early works for the River Thames Scheme, a £600 million project to develop two new flood channel sections for the River Thames.The River Thames Scheme aims to reduce the risk of flooding for approximately 15,000 homes and businesses along the River Thames involving a series of measures, including new flood walls and embankments, improvements to existing flood defenses, and flood storage areas and diversion channels to temporarily hold excess water during times of heavy rain.The OSIL vibrocorer has been used to obtain sediment samples in dense or consolida
New WaveNet Data Shows Record UK Sea Temperatures
Sea temperatures across the south and east of England hit record breaking levels this summer, new data published by Cefas shows.The data provided by WaveNet shows that sites in Tyne/Tees (off the Yorkshire coast), Dowsing, Southwold, Gabbard (in the southern North sea), South Knock (Thames estuary) and Hastings (in the English Channel) and around to Poole Bay in the Western Channel have reached new highs. In the southern North Sea, temperatures were above 20 degrees for several weeks and reached 21 degrees at South Knock beating the last 20 years of data previously collected.While these waters are
Series of High-res Surveys to Track Changes in Thames River
A two-year project aims to locate and monitor the shifting boundaries of key biological habitats and short-term, small-scale changes in bathymetry important to the health of Connecticut’s Thames River and Long Island Sound ecosystems. Marine technology company ThayerMahan, which recently completed an underwater survey using its SeaScout system to capture high-quality hydrographic imagery of the river, said the survey is being conducted under a National Institute for Undersea Vehicle Technology (NIUVT) project in conjunction with the University of Connecticut (UConn)’s Department of
Proserv Subsea Controls for IOG's SNS Development
a complete subsea controls system contract for IOG’s Core Project Phase 1 development in the UK Southern North Sea.IOG's Core Project Phase 1 comprises the development and production of the Southwark, Blythe, and Elgood fields through a total of five wells with gas transported onshore via the Thames Pipeline.Proserv will be responsible for the engineering, construction, and installation of the subsea control system for the Elgood single-well subsea tieback. The system will consist of a master control station, subsea control module, subsea distribution, and instrumentation.The Elgood gas field
IOG Taps Subsea 7 for North Sea Project SURF
project management, engineering, procurement, construction, and installation of 35km of flow lines between the IOG's Southwark, Blythe, and Elgood fields, together with subsea structures, an umbilical, and associated subsea tie-ins.More precisely, Subsea 7 will provide a 6km 24-inch extension to the Thames Pipeline to the Southwark platform, a 25km 12-inch line connecting the Blythe platform to the Thames Pipeline, and a 9km 6-inch pipeline and an umbilical connecting the Elgood field to the Blythe platform, and associated subsea structures and tie-ins.Confirmation of this award follows a competitive
Protecting Ports from Sea Level Rise
the 1953 North Sea Flood in the Netherlands when a storm surge occurred on top of astronomical high tides causing thousands of deaths, property and economic damages. The Dutch and UK reacted and increased construction of sea defenses including storm surge barriers, such as the Delta Works and River Thames barriers. In the US the New Bedford/Fairhaven port was severely flooded by hurricanes in 1938 and 1954 causing $8.3 million in damages, which lead to the construction of the New Bedford Hurricane Barrier in 1962 by the Army Corps of Engineers at a cost of $18.6 million. The Army Corps
ROV Helps Recovery Dive Teams Locate Dumped Car
and clarity, the ROV gives us a tool to send in and scout the underwater environment prior to sending in any public safety divers.”Other teams that use JW Fishers ROV line are Washington County Sheriff’s office, Snohomish County Sheriff’s office, Beijing Marine Police in China, Thames Water Works in the United Kingdom and Henderson County EMA Services