Marine Technology Reporter Blogs - bakerhughes
The World´s First All-Electric Intelligent Completion System – Back to the Future
The all-electric intelligent completion system has evolved for deep and ultra deepwater. When the world's first all-electric intelligent completion was installed in a subsea deepwater well in the Campos Basin, it was the culmination of five years of development, testing and trials. System acceptance was mild, but with the improvements that have been made and the vital role this system will have in ultra deepwater plays, its future looks very bright.On Aug. 3, 2003, the world's first subsea, deepwater, all-electric intelligent completion system was installed in the 8-MLS-67HA-RJS well, in 3,540 ft (1,180 m) of water at Marlim Sul field. The well is about 60 miles (100 km) offshore at the Campos basin, Rio de Janeiro, Brazil.
Baker Hughes Subsea Systems in Brazil
Baker Hughes Centrilift ESP system pumps can be found in various important Petrobras plays. Petrobras has been using the Baker Hughes Centrilift subsea pressure boosting system in the deepwater Jubarte Field offshore Brazil in the Campos Basin for about three years now. The one megawatt electrical submersible pumping system (ESP) was installed at Jubarte in November 2005, but was not brought on line until 2007, following hook up of the Floating Production Storage and Offloading (FPSO) vessel. The system is producing approximately 22,000 BPD in 4,600 feet of water. Petrobras installed at least eight additional vertical booster stations using ESP technology at Jubarte in the months following the first system going online..