Strategic Local FPSO Builders Chosen
Claudio Paschoa
November 15, 2010
With the intention of making a more efficient pre-salt FPSO production in Brazil, Petrobras had selected the Rio Grande Shipyard works and dry-dock to be their FPSO production center. There was still a need for a tender process to select which local company would be responsible for the construction process of the first 8 FPSOs to be built from a total of 40 FPSOs originally calculated to be needed for the pre-salt development. These units are part of the new strategy for the construction of production units, designed to simplify projects and standardize equipment. Producing identical hulls in series will accelerate the construction phase, and allow economies of scale and cost optimization.