Wednesday, April 24, 2024

Marine Technology Reporter Blogs - technologies

OTC Brasil 2013 – Petrobras Geology & Geophysics Expertise

November 13, 2013

3 01
During the OTC Brasil 2013 there were daily panel session, which covered some interesting themes. On Wednesday, October 30th, the panel session: Perspectives on E&P in the South Atlantic, had as one of its panelists Petrobras’ E&P Director, José Miranda Formigli Filho, known throughout Brazil simply as Formigli. According to Formigli, Petrobras’ knowledge of geology and geophysics (G&G) was vital for the national operator to meet the technological challenges and reach its exploratory success in deepwater pre-salt and post-salt E&P. Formigli estimated that by 2020 the pre-salt production will represent 50% of Petrobras’ output with the potential to reach some 31 billion barrels boe. By 2035, some 39 million barrels per day of new crude oil supply will be needed.

Major Effort to Increase Campos Basin Output

June 15, 2013

Petrobras has set plans to spend $5.6 billion through 2016 to increase output at the Campos Basin mature fields which have had decreased outputs for some time. Most post salt fields at the Campos Basin have been in production since the 1980s, some of which have been major producers. A steep decline in production began around 2009, not only due to the aging fields having low reserves but also because of lack of investments in operational resources and equipment for the older fields. The national operator will invest $1 billion in new money and spend $4.6 billion in operating costs to boost efficiency in the offshore Campos Basin operating unit to historic levels of about 90%, up from 72% in the first quarter of 2012.

FMC Starts 2010 with Two New Contracts Awarded by Petrobras

September 27, 2010

fmcstarts withtwonewcontractsawardedbypetrobrasimg
FMC signs an $80 million subsea service contract with Petrobras in January and is awarded a $400 million contract for subsea trees in February.FMC Technologies signed a subsea service contract with Petrobras effective through 2012 and expected to result in an additional $80 million in revenue. FMC's scope of supply includes storage, maintenance, commissioning and offshore services for subsea and topside control systems and drill pipe riser systems. "FMC has a strong and longstanding relationship with Petrobras," said John Gremp, Executive Vice President of FMC Technologies. FMC Technologies has signed a four-year subsea tree frame agreement with Petrobras.
The February 2024 edition of Marine Technology Reporter is focused on Oceanographic topics and technologies.
Read the Magazine Sponsored by

Drawing the Line: The Farthest, Deepest Limits

Marine Technology Magazine Cover Mar 2024 -

Marine Technology Reporter is the world's largest audited subsea industry publication serving the offshore energy, subsea defense and scientific communities.

Subscribe
Marine Technology ENews subscription

Marine Technology ENews is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for MTR E-news