Cased Hole Completions System Safety – Part 2
Claudio Paschoa
July 3, 2014
The quality of a cementing job is vital to the safety, efficiency and cost effectiveness of deepwater well. Yet, well casings can be made even safer by the addition of a barrier in the annulus between casings. Offshore service providers have developed a variety of ways to create this extra barrier. Baker Hughes has developed its version of a secondary mechanical pressure barrier above the uppermost hydrocarbon zone, designed to prevent any unintended and uncontrolled flow of reservoir fluids to surface in the event of failure of the cement barrier, and also help boost production rates by eliminating flow that would otherwise be lost to the annulus (if positioned in the B-Annulus*). Their solution is an electronically actuated packer with proven zero-extrusion gap seal technology.