Marine Technology Reporter Blogs - contract

Brazil OSV Market

February 7, 2014

slide 11
In the wake of the Subsea Vessel Brazil conference in Rio, Petrobras announced the approval to contract eight support vessels for its offshore activities. These are part of the 3rd Fleet OSV Renewal Plan (Prorefam). This is the 5th round and 4 vessels will be contracted from Bram Offshore, to be build at the Navship shipyard in the state of Santa Catarina, 3 from Starnav, with construction planned for the Detroit shipyard, also in Santa Catarina and 1 from Norskan, which will be built at the STX (Vard) shipyard in Niteroi, across the bridge from the city of Rio, where the Dof and Nordskan build all their Brazilian flagged ships. This is good news for the shipyards involved and for the OSV market in general, as the Brazilian offshore maritime market is heavily dependent on Petrobras orders.

Major New O&G Pipelines Raising Environmental Concerns

June 16, 2013

seabed nh
Recently Petrobras, the Brazilian national O&G operator announced that it had awarded Technip a 5-year frame agreement contract for the supply of around 1,400 kilometers of flexible pipes, with supply starting in 2013 and orders are guaranteed for at least 50% of the total value, which is currently estimated to be worth around US$2.1 billion. Flexible pipes for the contract will be produced both at Technip's existing manufacturing site in Vitoria, and also at our new manufacturing facility under construction in Açu, Brazil. This agreement is a direct spinoff of the investment Technip made last year in building a second state-of-the-art flexible pipe plant in Brazil…

General Electric Targeting Massive Growth in Brazil

November 23, 2010

generalelectrictargetingmassivegrowthinbrazil
Present in Brazil for over 90 years, GE is preparing to invest $500 million in Brazil along the next 3 years and maintain its investments in local training and research. GE O&G mayl be one of the main recipients of this local investment as it is a market with great growth potential and where GE already has a very strong presence. Very recently Petrobras and General Electric (GE) signed an agreement for future technology cooperation in R&D projects for monitoring and controlling oil and gas production systems. The development of subsea and compact systems for O&GQ production, and remote monitoring of equipment are among the purposes of this agreement, which highlights the importance GE has had in the development of Brazil´s oil industry.

FMC Technologies Awarded 4-Year Contract with Petrobras

June 28, 2010

fmctechnologiesawarded yearcontractwithpetrobras
FMC will deliver subsea manifolds and another range of subsea equipment to Petrobras. FMC Technologies has signed a four-year subsea manifold frame agreement with Petrobras. The award is expected to result in approximately $300 million in revenue to FMC Technologies if all of the subsea equipment included in the agreement is ordered. The agreement provides assurance that a minimum of 75 percent of the contracted equipment will be ordered during the contract's four-year call-off period. FMC's scope of supply includes the manufacture of up to eight subsea manifolds with subsea multiplex control systems. All equipment will be engineered and manufactured at FMC's facility in Rio de Janeiro, Brazil. Deliveries are scheduled to commence in 2012.

New Well Confirms Tupi´s Potential Recoverable Oil Reserves

May 7, 2010

newwellconfirmstupispotentialrecoverableoilreservesimg
New discovery at the Tupi field confirms Tupi potential and another new discovery in an ANP block, to be included in onerous concession contract with Petrobras.In early April 2010 Petrobras Petróleo Brasileiro S.A. announced that it finalized the drilling of another well in the Tupi field which confirms the potential of the pre-salt reservoirs in that field. The new well, 3-BRSA-795-RJS (3-RJS-666), and informally known as Tupi OW, is located in the area of the Tupi Evaluation Plan, at a depth of 2,131 meters, nearly 270 km of the coast of Rio de Janeiro, and 12.5 km northeast of the discovery well, 1-RJS-628 (1-BRSA-369), known as Tupi.

FMC Starts 2010 with Two New Contracts Awarded by Petrobras

September 27, 2010

fmcstarts withtwonewcontractsawardedbypetrobrasimg
FMC signs an $80 million subsea service contract with Petrobras in January and is awarded a $400 million contract for subsea trees in February.FMC Technologies signed a subsea service contract with Petrobras effective through 2012 and expected to result in an additional $80 million in revenue. FMC's scope of supply includes storage, maintenance, commissioning and offshore services for subsea and topside control systems and drill pipe riser systems. "FMC has a strong and longstanding relationship with Petrobras," said John Gremp, Executive Vice President of FMC Technologies. FMC Technologies has signed a four-year subsea tree frame agreement with Petrobras.
The February 2024 edition of Marine Technology Reporter is focused on Oceanographic topics and technologies.
Read the Magazine Sponsored by

News of Note

Marine Technology Magazine Cover Mar 2024 -

Marine Technology Reporter is the world's largest audited subsea industry publication serving the offshore energy, subsea defense and scientific communities.

Subscribe
Marine Technology ENews subscription

Marine Technology ENews is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for MTR E-news