Technip Wins Umbilical Supply Order
by ENI S.p.A. to supply umbilicals to the Block 15/06 East Hub Development offshore Angola. This field is located approximately 350 kilometers north of Luanda, at water depths of 450-600 meters. The contract covers project management and manufacture of about 15 kilometers of dynamic and static steel tube umbilicals. Technip Umbilicals facility in Lobito, Angola, with support from Technip Umbilicals in Newcastle, UK, will manufacture the umbilicals that are scheduled to be completed in the second half of 2016. This project follows on Technip Umbilicals’ successful completion of many deep
Offshore Nigeria Contract for Aker Solutions
. The Erha North phase two development is an extension of the existing Erha subsea system and infrastructure located approximately 97 kilometers offshore Nigeria in water depths between 1,000 and 1,200 meters. Aker Solutions' scope of work includes the delivery of two dynamic and two static steel tube umbilicals, at a total length of 16.5 kilometers. The umbilicals will be delivered in 2014. The umbilicals will be designed, engineered and manufactured at Aker Solutions' facility in Mobile, Alabama, in the U.S., supported by project management and engineering by a local team in Lagos
December 2025