Huisman Brazil Receives First Order
construction equipment on board. This facility will be used for the manufacturing of construction equipment for the Brazilian offshore market. The new Huisman production facility is planned to be operational in 2014. Besides the three sets of cranes, Huisman will also deliver three 550mt Tiltable Lay Systems for Subsea 7 and the two 650 and two 340mt Tiltable Lay Systems for Technip-DOF. All these pipelay equipment orders are part of a big Petrobas order and should be ready to serve the Brazilian market in 2017. huismanequipment.com  
Huisman Banks 10 Pipelay Equipment Orders
Huisman, a worldwide specialist in lifting, drilling and subsea solutions, has secured new contracts for 10 pipelay systems with various major offshore pipelay contractors. The new contracts include three 550mt Tiltable Lay Systems (TLS) and one 325mt Vertical Lay System (VLS) for Subsea 7, two 650mt TLS and two 340mt VLS for Technip-DOF, one 275mt VLS and one 570mt Multi-lay System for Ceona. The equipment will be built at the various Huisman production facilities in The Netherlands, Czech Republic, China and Brazil. Delivery of these pipelay systems is scheduled between the end of this year and
August 2025