civil/ structural engineer

Engineer  / Naval Architect
Description

ARMADA TPCE (M) SDN BHD (January 2018 – present)

Menara Tan & Tan, Kuala Lumpur

  • PROVISION OF FACILITIES IMPROVEMENT TECHNICAL SERVICES FOR PM8E FOR ENQUEST
    • Responsible in preparing & completing PM8E ME-350 Crane preservation work structural integrity report.
    • Updating SACS model for Seligi A Compression and prepare Inplace Analysis.

 

  • PROVISION OF FCILITIES IMPROVEMENT PROPOSAL (FIP) ENGINEERING AND PROJECT INTERFACE SUPPORTS SERVICES FOR PETRONAS CARIGALI SARAWAK OPERATION (SKO)
    • Responsible in preparing & completing Deck extension Lifting Analysis Report, Detailed design for Baronia- B Complex instrument Air System Upgrade.
    • Responsible in preparing & completing Topside Inplace Analysis Report, Detailed design for Baronia- B Complex instrument Air System Upgrade.

 

 

RNZ INTEGRATED (M) SDN BHD (Nov 2010 – December 2017)

Menara Great Eastern, Kuala Lumpur

  • PROVISION OF REVISIT DETAILED DESIGN ENGINEERING SERVICES FOR KINABALU NON ASSOCIATED GAS (NAG) PHASE II
    • Responsible in preparing & completing Transportation Analysis for Module 6.

 

  • PROVISION OF DETAILED DESIGN ENGINEERING SERVICES FOR SK310 B15 DEVELOPMENT
    • Responsible in preparing & completing Topside Weight Control Report for B15 Platform.
    • Responsible in preparing & completing Topside Weight Control Report for B15 Platform.
    • Responsible in preparing & completing B11RD Substructure Miscellaneous Analysis and design report.
    • Responsible in preparing & completing B11RD Topside Miscellaneous Analysis and design report.

 

  • PROVISION OF FEED AND EPCIC OF WELLHEAD PLATFORMS (WHP) FOR BOKOR PHASE 3 RE-DEVELOPMENT PROJECT, ENHANCED OIL RECOVERY
    • Responsible in preparing & completing Topside Weight Control Report for BODP-E & BODP-F Platform.
    • Responsible in preparing & completing Topside Weight Control Report for BODP-D Platform.
    • Responsible in preparing & completing Substructure Weight Control Report for BODP-E & BODP-F Platform.
    • Responsible in preparing & completing Substructure Weight Control Report for BODP-D Platform.

 

  • PROVISION OF STRUCTURAL INTEGRITY ASSESSMENT AND LOAD MONITORING FOR PETRONAS CARIGALI SDN. BHD. - SARAWAK OPERATIONS (PACKAGE 1)
  • Responsible in preparing & completing Model Report for BEP-A Platform.
  • Responsible in preparing & completing Static Inplace Analysis and Soft Mooring Assessment Report for BEP-A Platform.
  • STRUCTURAL ENGINEERING REVERIFICATION FOR GARAGOL DENIZ WEST OFFSHORE FACILITIES OIL DEVELOPMENT PROJECT
  • Responsible in preparing & completing the Pile Drivability Analysis Report
  • Provision of FEED Services for SKR-A, Pipelines and HTI for KasaWARI GAS DEVELOPMENT PROJECT
  • Responsible in preparing & completing the SKR-Topside Geometri Computer Model Analysis Report.
  • Responsible in preparing & completing the SKR-Topside Load Formulation Report.
  • Responsible in preparing & completing the SKR-Topside Inplace analysis Report.
  • Responsible in preparing & completing the SKR-Topside Loadout analysis Report.

 

  • SACS Model Updating & Integrity Assessment for 10 Platforms
  • Responsible in preparing & completing the EWDP-B Structural Model Analysis Report.
  • Responsible in preparing & completing the EWDP-B Structural Inplace Analysis Report.

 

  • Provision of Front End Engineering Design (FEED) for MAGTYMGULY gas Recycling Development Project.   
  • Extract Support reaction under service condition from all building and pipe rack structural analysis output and subsequently applied into foundation design calculation accordingly.
  • To perform Pipe rack analysis using STAAD PRO
  • To perform  structural and foundation analysis using STAAD PRO

 

  • Provision of Engineering, Procurement, Construction, Hook Up and construction (EPCC) of Garagol Deniz West Offshore Facilities for Garagol Deniz West oil Development Project
  • Responsible in preparing & completing the GDDP-A Boat landing and Boat Impact Analysis Report.
  • Responsible in preparing & completing the GDDP-A Miscellaneous Report.
  • Responsible in preparing and handling Structural Procurements for GDDP-A.
  • Responsible in handling and reviewing Vendor documents during VDI/VDR Stage.
  • Preparing & Updating Steel Specification for GDDP-A.
  • Preparing & Updating Grout Seals Specification For GDDP-A
  • Preparing & Updating Diaphragm Closure Specification for GDDP-A.
  • Preparing & Updating Painting & Coating Specification for GDDP-A.
  • Preparing & Updating Shock Cell Specification for GDDP-A.
  • Preparing & Updating Pile Gripper Specification for GDDP-A.
  • Preparing Technical Bid Evaluation for GDDP-A Elastomeric Pads.
  • Preparing Technical Bid Evaluation for GDDP-A LMU’s.
  • Preparing Technical Bid Evaluation for GDDP-A Grout Seals.
  • Preparing Technical Bid Evaluation for GDDP-A Shock Cell.
  • Preparing Technical Bid Evaluation for GDDP-A Boatlanding & Floatover Fender. 

 

  • Provision For Tukau Timur Shallow Front End Engineering Design (FEED) And Tukau Timur Deep Conceptual Engineering For Baram Delta Gas Gathering-2 (BARDEGG-2) And Baronia Enhanced Oil Recovery (EOR) Development Project For Petronas Carigali Sdn Bhd (PCSB)
  • Responsible in preparing & completing the Substructure On-Bottom Analysis & Report for TTJT-A Platform.

 

  • Provision For Detailed Engineering (Phase 1) And Frond End Engineering Design (FEED) (Phase 2) For Baram Delta Gas Gathering-2 (BARDEGG-2) And Baronia Enhanced Oil Recovery (EOR) Development Project For Petronas Carigali Sdn Bhd (PCSB)
  • Responsible in preparing & completing the Substructure On-Bottom Analysis & Report for BNCPP-B Platform.
  • Responsible in preparing & completing the Substructure Miscellaneous Report for BNCPP-B Platform.
  • Responsible in preparing & completing the Substructure Launch Analysis & Report for BNCPP-B Platform.
  • Responsible in preparing & completing the Substructure Flotation Analysis & Report for BNCPP-B Platform.
  • Responsible in preparing & completing the Catholic Protection Analysis & Report for BNCPP-B Platform.

 

  • Provision Of Engineering Services For FEED And Follow-On Engineering Of Phase-3 Development (Wellhead Platforms, Subsea Pipeline And Brownfield Works) for Carigali-PTTEPI Operating Company Sdn Bhd (CPOC)
  • Responsible in preparing & completing the Jacket weight Control Report for TAPI-A and Melati (MTA) Platform.
  • Responsible in preparing & completing the Topside weight Control Report for TAPI-A and Melati (MTA) Platform.

 

  • Pipeline Detailed Engineering Design for Samarang Pipeline Replacement Project For Petronas Carigali Sdn Bhd (PCSB)
  • Responsible in preparing & completing the Structural Assessment Analysis Design Report for SMJT-G platform.
  • Responsible in Preparing & Completing The SMJT-E Miscellaneous Design Report and Analysis.

 

 

  • Provision Of Engineering, Procurement, Construction And Commissioning (EPCC) Of For Central Diyarbekir Development Project Topsides And Jacket For Petronas Carigali (Turkmenistan) Sdn Bhd (PCTSB) / ILK INŞAAT
  • Responsible in preparing & completing the Jacket Loadout analysis & report.
  • Responsible in preparing & completing the Drilling Deck Lifting analysis & report.
  • Responsible to perform Loadout analysis for Main Platform and prepare report.
  • Responsible in preparing & completing the Topsides Inplace Design report.

 

  • Provision of Front End Engineering Design (FEED) Services for Yetagun North Development Project for PC Myanmar (Hong Kong) Limited (PCML)
  • Responsible in preparing & completing the YET-D Substructure Boat Impact analysis & report.
  • Responsible to perform On-Bottom analysis for YET-D platform and prepare the report.

 

  • Provision Of Engineering Design For PMO Pipeline Replacement Project (PPRP) For Petronas Carigali Sdn Bhd (PCSB)
  • Responsible to perform lifting analysis for Bekok-A platform and prepare the report.
  • Responsible to perform lifting analysis for Tiong-A platform and prepare the report.

 

  • Provision Of Conceptual And Basic Engineering Services For Diamond Development Project, Blocks 01 & 02 Offshore Vietnam For PC Vietnam Limited (PCVL)
  • Responsible to prepare and complete the DMDP-A Boat Impact analysis and report.

 

  • Provision Of Detailed Design Services For Bekok-B Infill Project For Petronas Carigali Sdn Bhd (PCSB)
  • Responsible to prepare and complete the new conductor boat impact analysis and report.

 

  • Provision Of Engineering Support Services For Cendor Phase 2 Development Project, Block PM-304 for Petrofac (Malaysia-PM304) Limited (Early Production System Detail Design)
  • Assigned to go for a site visit at Cendor MOPU in Terengganu.
  • Responsible to check the location and the installation path for the new gangway.
  • Responsible to check the new deck extension for drop object protection over the ESD valve.

 

  • Provision Of Detailed Design Services (Phase II) for Kinabalu Non Associated Gas (NAG) Project for PETRONAS Carigali Sdn Bhd (PCSB)
  • Responsible in preparing the KNPG-B Installation Bumper & Welding Check Analysis for Module 1,2,3,4,5, MSF North, MSF Drilling and MSF South.

 

  • Detailed Design Engineering Of Mobile Offshore Production Unit (MOPU) Facility West Desaru Development Project, Block PM304 for Petrofac E&C Sdn Bhd
  • Acting as a Structural Refurbishment Engineer.
  • Responsible to prepare & completed Scope of Work for Structural Refurbishment.
  • Has been assigned to site to identify the structural and architectural item/member for the refurbishment work.
  • Responsible in preparing the structural MTO.

 

  • Provision Of Basic Design, Front End Engineering Design (FEED) and Detailed Design Services For South Pars Gas Development Project Phases 22, 23 & 24 For Petroleum Investigation Research & Engineering Co. (PIRE Co.) / PARS Oil And Gas Company (POGC)
  • Perform On-Bottom and Mudmat Design Analysis for the offshore pipeline crossing.
  • Perform a jacket Pre-service analysis & report on the on-bottom analysis and mudmat design for four (4) platforms which is SPD22, SPD23, SPD24A and SPD24B.
  • Perform boat impact analysis & report for two (2) different platform including SPD22 and SPD23.
  • Perform a load out analysis for SPD24B.
  • Perform Pile Driveability analysis & report for Flare tower including FSP22, FSP23, FSP24A, and FSP24B.

 

  • Provision Of Detailed Design Services (Phase II) for Kinabalu Non Associated Gas (NAG) Project for PETRONAS Carigali Sdn Bhd (PCSB)
  • Performed Topside’s In-Place Analysis for Service Platform   (Module 6) including the Access Platform, Strainer Service Platform, FE-245B and FIA 2460A.
  • Prepare KNPG-B Topside Miscellaneous Design Report for Module 6 (SOGT Compressor Train A & B).
  • Prepare the barge bumper analysis for Module 6.

 

 

GEOLAB (M) SDN BHD (June 2010 – Nov 2010)

Position    :     Engineer

WORK DESCRIPTION:

Performed non-destructive test (NDT) for pile and concrete structure at site including the PDA test, SIT test and Windsor probe test.

  • Pilling Work Fork The Proposed Construction Of Service Apartment Including
  • Piling Work For The Proposed And Completion Of Temporary Logistic Road At Jalan Bukit Kuching For Medini Development Iskandar Malaysia, Johor Darul, Takzim
  • Piling Work For The Proposed And Completion Of Petrol Station On PTD57015 H.S (D) 227378 Taman Setera Utama, Johor Bahru, Johor Darul, Takzim.
  • Piling Work For The Proposed And Completion Of Senai-Desaru Expressway (TNB Substation Package 3A), Johor, Darul Takzim
  • Piling Work For The Proposed And Completion Legoland, For Medini Development Iskandar Malaysia, Johor Darul, Takzim.
  • Proposed And Completion Of 23 Storey Apartment At Nusajaya, Johor Darul, Takzim
  • Piling Work For Proposed Construction Of Coastal Highway From Johor Bahru To Nusaya, Mukim Pulai, Daerah Johor Bahru, Johor Darul, Takzim
  • Piling Work For The Proposed And Completion Smart School For Medini Development Iskandar Malaysia, Johor Darul, Takzim

 

 

 

EDUCATIONs

July 2007 – April 2010 Universiti Teknologi Malaysia (UTM) Bachelor in Engineering
(Hons.) Civil  (CGPA:3.33)
July  2004 – Apr 2007 Universiti Teknologi Malaysia (UTM) Diploma in Civil Engineering (Hons.)   (CGPA:2.85)

 

SKILLS

Familiar with a range of proprietary software including SACS, GRL Weap, Microsoft Office, AutoCAD, Microsoft Visual Basics, Microsoft Project , STAAD Pro and familiar with relevant international codes and standards including PTS, AISC and API.

 

REFEREES

Name          : Helmy Hariri                           

Position      : Lead/Senior Engineer                   

Contact No: 019-2290440

 

Name          : Tasyriff Izzat                           

Position      : Lead/Senior Engineer                   

Contact No: 012-23685205

 

 

Availability                             : Available in 1 week

Skills
  • sacs 7 years by 2018
  • GRL weap 7 years by 2017
  • PTS 7 years by 2018
Employers
  • CIVIL/STRUCTURAL ENGINEER at RNZ INTEGRATED
    Oct 2010 - Dec 2017
  • CIVIL/STRUCTURAL ENGINEER at ARMADA TPCE
    Jan 2018
Educations
  • CIVIL ENGINEERING
    CIVIL ENGINEERING at UNIVERSITI TEKNOLOGI MALAYSIA
    2007 - 2010
NO 36, JALAN LEP 4/11 TAMAN LESTARI PUTRA SRI KEMBANGAN SELANGOR 43300
malaysia
View Contact Information
The February 2024 edition of Marine Technology Reporter is focused on Oceanographic topics and technologies.
Read the Magazine Sponsored by

Podcast: Deep Dive with Rhonda Moniz

Marine Technology Magazine Cover Mar 2024 -

Marine Technology Reporter is the world's largest audited subsea industry publication serving the offshore energy, subsea defense and scientific communities.

Subscribe
Marine Technology ENews subscription

Marine Technology ENews is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for MTR E-news