Jobs Resumes Post Resume Post Job

Ship repair manager

Project Engineering / Project Management
Description

VIDYA SAGAR SHUKLA

 

 


Personal Details:


Qualification:


 


Date of Birth:            28/09/1964

Nationality:                Indian

Passport No:              H 2032077 Exp 28/12/2018


Degree (equivalent) in ship building and Naval

Architect from Indian Navy

4 years Diploma in Mechanical Engineering (ship building and Naval Architect)


Computer Knowledge:

 

 Operating System Windows 95 / 98 / 2007 NT / XP.

 Office Applications Program MS Office 97 / 2000 / XP 2001 / XP 2003 (MS Word, MS Excel, MS - Outlook & Typing expert of English .

 Network Communication (Internet, E-mail).

 

 

 

Other Skills and Training Course:

 Ship repair manager course (SRM) Accredited Training provider by Indian Navy.

 Well versed in docking/ undocking of vessels.

   Possess in-depth ship repair knowledge in Class Requirements / Steel / Mechanical / Pipe/ Blasting &     Painting.

 Shipyard Supervisor safety course (SSSC), From Indian Navy and Dubai world dry docks.

 Safety leader ship Training (SLT) course training provided by Indian Navy

 QA/QC, NDT, inspections and prepare inspection test plans (ITPs).

     Fire and safety training.

 Shipyard fire fighting Course trained by Indian Navy & United Kingdom (Plymouth).

 Good ability to understand drawings such as arrangement, P&ID, isometric, procedure, construction standard, test memo.

 Collect all projects document & drawings, Procedure, and WPS form engineering department, issued out all documents in all section contractors following the work scope. Generated for all projects and issued to contactors for contractor withdrawal material form warehouse.

 Team communication and collaboration, coordinating with all the project schedule & planning, work progress report, man hour report, material buying, available status, material BOM, contactor daily man hour

and work progress reports above mention all the activities weekly twice monitoring.

 ISO 9001:2008,18001:2007 & 14001:2004 OHSAS procedures/ audits (MR)

 

Work Experience:

 

April 2010 –  Present

Urmila Projects Services

Project  Manager

 

Work involved in heavy lifts, erection of steel structures and equipments, ship repairs, inspections, testing of tanks, new construction of barges/ tugs / ships, and conversions, liaison with IRS and other registering authorities, rendering services for inspections, Operation manager overall in charge.


 

The Company

 

Is into transportation of heavy lifts via Sea & road. The conduction for ship/ barges modification work, new conversion work, demolition work, and also this company had various operation works shipbuilding & Ship repaijobs.

 

Job Responsibilities

 

 Manage and guide sea transportation projects and conversion works as per drawings and specifications.

 Conduct daily meetings on ship repairs production/ progress and safety with respect  job onboard to ensure safety of personal and property are not endangered.

 Responsible for project planning for taking new consignments /execution and monitoring of new ship Construction /conversion /repair works. Liaison with foreign clients.

 Develop good working relationships with customer and maintaining team work showing high interests.

 Responsible for ships repair coordination and supervision work to ensure that relevant operations are executed in the highest work quality & safety standards while meeting customers contractual expectation, specification and budget.

 Resolve  daily conflicts at  ground  level   issues and  monitoring    and coordinating    sequential  and incompatible job affecting master schedule  whenever required.

 Report on work progress, material status, billing/costing and performance tracking.

 Provide advice and recommendations to management/production on project processes / activities to enhance productivity, quality and cost effectiveness.

 Capture additional works and raise work list and provide information to commercial department for more competitive pricing.

 

 

 

February 2009 –  February 2010

Bombay Marine Pvt. Ltd. (Dubai Dry Docks)Senior Estimator and Project Coordinator

 

Project overall in charge erection of piping & steel structural sections installations, meetings with foreign clients on production and progress matters.

 

The Company

 

Bombay marine, it’s under one of the sub Contractor Company for Dubai Dry Docks. The conduction for Piping erection work, steel structures modification work, new conversion work, demolition work, and also this company had various operation works for mechanical, piping & painting.

Job Responsibilities

 

 Responsible for monitoring ships repair job progress and ensure quality work at targeted schedule

 Leading and supervising projects from cradle to grave - project management, supply, installation, testing, commissioning.

 Responsible for supervising, coordinating and leading a team of workers and to perform on-site piping pre- fabrication and installation.

 Responsible for assisting in manpower and resourcing scheduling and deployment, daily man hour returns and coordinate in all aspects of site issues.

 Responsible for liaising with QA/QC inspectors of Dubai shipyard and comply with inspection requirements.

 Responsible for monitoring job progress and ensure quality work at targeted schedule.

 


 

 

  • All the completion of Piping work, Progress work to prepared for claim and submission to costing 

   department.

 Every week conduct to project progress meeting and prepared the schedule to worker to assign the job and monitoring of KPI.

 All the project variation work go to take photographs in- on the site and draw the drawing, to prepared work completion and estimation dia inch . And Prepared claim and costing for the above project.

 QC in-charge to manage the project.

 

 

 

July 2007 - January 2009

Urmila Projects Services

Project Manager

 

Work involved in heavy lifts, ship repair manager, Operation manager overall in charge.

 

The Company

 

Is into transportation of heavy lifts via Sea & road. The conduction for ship/ barges modification work, new conversion work, demolition work, and al so this company had various operations works shipbuilding & Ship repair job.

 

Job Responsibilities

 

Manage and direct ship repair projects and conversion works as per drawings and specifications.

Conduct and daily VSCC meeting on hot-works onboard ships and in compatible job onboard to ensure safety of personal and property are not endangered.

Responsible for project planning, execution and monitoring of new ship

 Construction /conversion /repairs projects.

Meet repair / refit schedule by planning, monitoring projectcritical path cost control and execution.

Develop good working relationship with customer and maintaining team work showing high interests.

Responsible for site coordination and supervision work to ensure that relevant operations are executed in the highest work quality & safety standards while meeting customers contractual expectation, specification and budget.

 Resolve daily conflicts at ground level issues and monitoring and coordinating sequential and incompatible job affecting master schedule whenever required.

 Report on work progress, material status, billing/costing and performance tracking.

Provide advice and recommendations to management/production on project processes / activities to enhance productivity, quality and cost effectiveness.

 Capture additional works and raise work list and provide information to commercial department for more competitive pricing.

 

 

 

June 2006 –  June 2007

Reliance Gas Transportation Infrastructure Ltd

Lead Engineer

 

Compressor station no. 5.

Job Responsibilities.

 

Site construction of compressor station (oil & gas), was over all in-charge for erection of static and rotary equipments. PEB’s erection as per AISC & ASME standard with concrete foundations and anchor bolts alignment as per drawings and specifications, calculation of BOQs, supervision of pipe layouts for gas transportation as per GA drawings, supervision of civil foundations execution and monitoring erection activities, assisting site in-charge for all construction activities in the site including follow ups of the vendors, man power / resources, pigging & hydro testing of pipes as per specifications, coatings and thickness measurements, surface preparations as per SA 2.5 standards, attending meetings and aiming for achieving targets in time, certifying the vendor’s job completion reports.

 

Arrange, Participate in Project Kick-off meeting, Contract Review, Design and Model reviews and facilitate completion of the Design and Engineering work.

Arrange design inputs from Client, other agencies for carrying out engineering activities.

Participate in the Planning and Scheduling of engineering activity.

Monitor the Engineering progress, address shortfalls, develop recovery plans and ensure plans made are implemented.

Ensure that Engineering deliverables generated by the Engineering team meet the Project requirements in terms of technical content and follow Project specific procedures.

Ensure participation of the Engineering team members in Project Engineering Reviews and assist resolution of any issues arising out of the same.

Conduct regular Project Review meetings and record, circulate all minutes as per project needs.

Ensure that Interface items between disciplines maintained.

Identify with the Engineering team potential areas of variation that may arise during the course of engineering and communicate the same to the project management team to ensure its non -occurrence or record changes in scope.

Facilitate project as well as discipline Audits and ensure QA activities are carried out on the project.

Act as the interface between the Engineering team and the Project Management team and ensure smooth transfer of information between the two.

 Coordinates with site on all engineering related matters As Well as supervise.

 

 

 

April 2004 –  May 2006

IMI Engineering Ltd

Country manager

 

Worked as 3rd party country manager with a team of qualified engineers for QA/QC, inspection of proto’s (telecom towers) all over India (vendors)and submitting final reports to the clients of corporate sectors with respect to Bureu of Indian standards/ specifications and as per GA drawings including civil foundations. Responsible for preparing inspection test plans and check lists for production and accepting of mass fabrication of towers.

 

 

 

 

 

 

 

 

June 2001 –  March 2004

Reliance Engineering Associates Pvt. Ltd

Site Engineer

 

Worked as a site engineer and was overall in-charge for executing telecom tower’s civil foundations construction availability / fabrication/ erection cum inspection of telecom towers in vendor’s fabrication yard and erection at sites. Inspection of RF cabling, issuing of MINs, vertical stability checks, preparing check lists (inspection test plans), checking foundation readiness with anchor bolts alignments as per drawings, certifying job completion reports of vendors. Extensive traveling to sites completed approx. 950 sites all over Punjab.

 

February 2000 –  May 2001

Government Medical College and Hospital

Senior Fire inspector

 

In-charge and responsible for fixed and portable fire fighting equipments of entire hospital. Ensure that fire alarms and all fire fighting equipments are in operational status. Conduct mock drills for fire fighting. Trained

150 security guards in first aid and use of portable fire fighting extinguishers as per type of fire.

 

 

 

August 1984 –  October 1999

Chief Shipwright Artificer

Mechanical Engineer

 

Responsible for ship repairs, new conversions / planned preventive maintenance of Air handling units, HVAC system of ships, erection of machineries on foundations, testing of tanks, welding inspections & hull survey on board vessels and dockyards. Deployed abroad to UK (Plymouth, Davenport for 2 years for defect rectification and conversion of Air craft career, Indian Naval Ship.


flat 701, c- wing, bldg-3, shankeshwar presidency, tawripada, kalyan west, maharashtra, india kalyan maharashtra 91
India
View Contact Information
The February 2024 edition of Marine Technology Reporter is focused on Oceanographic topics and technologies.
Read the Magazine Sponsored by

Drawing the Line: The Farthest, Deepest Limits

Marine Technology Magazine Cover Mar 2024 -

Marine Technology Reporter is the world's largest audited subsea industry publication serving the offshore energy, subsea defense and scientific communities.

Subscribe
Marine Technology ENews subscription

Marine Technology ENews is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for MTR E-news