
Polarcus Kicks Off Australia Survey
Polarcus has begun the latest phase of the Cygnus regional multi-client 3D survey in the Vulcan Sub-basin, offshore north-west Australia, the marine geophysical company announced on Monday.The 1,500-square-kilometer Phase 3 South survey, covering the Skua, Swift and Montara area, completes over 7,200 square kilometers of continuous XArray Triple Source coverage.The Cygnus anisotropic PSDM dataset provides exploration geoscientists with a 3D dataset which allows evaluation of the basin including a number of farm-in opportunities and several areas of open acreage.The prospectivity of the basin has again

TechnipFMC Wins EPCI Contract from Woodside
TechnipFMC announced on Friday it has been awarded an integrated engineering, procurement, construction and installation (EPCI) contract by Woodside for the development of the Pyxis and Xena fields, located offshore North West Australia.The contract, which includes the design, manufacture, deliver and install subsea equipment including subsea production system, flexible flowlines and umbilicals, is valued between $75 million and $250 million, and is the first call-off under a recently executed five-year EPCI Frame Agreement between TechnipFMC and Woodside.Arnaud Piéton, President Subsea at

Subsea 7 Wins Three Woodside Contracts
to strengthening our relationship with Woodside,” said Gilles Lafaye, Vice President Africa for Subsea 7. “Senegal is an exciting new market for Subsea 7 and we are pleased to support the local oil and gas industry.”The Scarborough Field is located approximately 380km offshore North West Australia. Subject to FID by the Scarborough joint venture, the full integrated project scope of work would include the engineering, procurement, construction and installation of subsea rigid pipelines, flexible risers, umbilicals and associated infrastructure. The Scarborough integrated project will

Trelleborg Suite Supplied to Prelude FLNG
;s marine systems operation has supplied a suite of products to Shell’s Prelude FLNG facility, the largest offshore facility ever constructed. Prelude, which is 488 meters long, 74 meters wide, and made with more than 260,000 tons of steel, will extract and liquefy natural gas from a site in North West Australia. Trelleborg supplied its gas transfer technology and SafePilot navigational and piloting systems for Prelude. “Our SafePilot solution, SSL, ESL and radio ESD for tandem condensate offload have been used on Shell’s Prelude FLNG,” said Richard Hepworth, President