New Wave Media

January 23, 2013

Overload test for Liebherr Heavy Lift Crane

Currently the support vessel Caballo Marango is being equipped with a Liebherr heavy lift crane, type BOS 35000, in the port of Rostock. The overload test has now been carried out and the offshore crane successfully lifted 1,100 t which is 110%  of its maximum lifting capacity.


The crane, offering a maximum boom length of 102 m, was built at the Liebherr plant in Rostock within the last eight months. Forming part of the Caballo Marango’s equipment it is intended to execute future assembly and reconstruction work on oil rigs in the Gulf of Mexico for the Mexican service company Oceanografia. The versatile crane can, however, also be applied for installing offshore wind parks.


The advantages of the BOS 35000 include easy slewing, so allowing the customer to work efficiently and economically.


www.Liebherr.com
 

port of RostockGulf of Mexicooil rigs
The February 2024 edition of Marine Technology Reporter is focused on Oceanographic topics and technologies.
Read the Magazine Sponsored by

Authors & Contributors

Marine Technology Magazine Cover Mar 2024 -

Marine Technology Reporter is the world's largest audited subsea industry publication serving the offshore energy, subsea defense and scientific communities.

Subscribe
Marine Technology ENews subscription

Marine Technology ENews is the subsea industry's largest circulation and most authoritative ENews Service, delivered to your Email three times per week

Subscribe for MTR E-news